Learn More: What to Consider When Planning to Deploy an EV Utility Fleet
SCE Launches Program to Install 38,000 EV Chargers
Charge Ready is the largest utility-run electric passenger vehicle charging infrastructure program in the nation.

Fairplex in Pomona installed 200 charging ports, the largest project of the Charge Ready pilot phase. Many chargers are available for public use.
Photo: Southern California Edison
Beginning July 12, businesses, government agencies, and other organizations in Southern California will be able to sign up to participate in Southern California Edison’s Charge Ready program, the largest electric passenger vehicle charging infrastructure program in the nation run by an investor-owned electric utility company.
The $436-million program, approved by the state last year, will add approximately 38,000 new electric car chargers throughout SCE’s service area over the next five years.
Through Charge Ready, SCE installs and maintains the supporting EV charging infrastructure while site hosts, who are non-residential SCE customers, typically own, operate, and maintain qualified charging stations.
“As SCE is preparing its electric grid to serve the increase in transportation electrification, more charging equipment is needed to give EV drivers and fleet operators the peace of mind they will be able to charge whenever they want,” said Carter Prescott, SCE director of eMobility and Building Electrification.
The large-scale program introduced at a virtual event July 12 is modeled after a much smaller pilot that concluded in May, in which SCE partnered with businesses, local governments, and other organizations to add more than 2,700 charge ports at nearly 150 sites.
SCE will continue to focus on providing charging infrastructure at workplaces, public parking lots, schools, hospitals, and destination centers, with an added emphasis on condominium and apartment complexes.
In the interest of making EV charging available to all Californians, Charge Ready sets a target to locate 50% of the chargers in state-designated disadvantaged communities, or economically-impacted communities that suffer most from the negative effects of air pollution.
In addition to Charge Ready for passenger EVs, SCE launched a program last year for larger trucks, buses, and off-road industrial equipment called Charge Ready Transport, which aims to add charging to support at least 8,490 medium- and heavy-duty EVs over a five-year period. The $356 million program is also modeled after the Charge Ready pilot.
More Green Fleet
Fuel Management's Next Evolution Centers on Connected Fleet Technology
Learn how fleets are integrating fueling, telematics, tank monitoring, EV charging, and data systems to improve efficiency and visibility.
Read More →
Landi Technologies Achieves CARB Certification of Ford 7.3L RNG/CNG Platform
Landi Technologies has gained CARB certification of its Ford 7.3L Renewable Natural Gas (RNG) and Compressed Natural Gas (CNG) platform for the Ford E-450, F-450/550/600, F-650/750, and F-53/59 platforms.
Read More →
Turning Connected Vehicle Data Into Decisions That Matter
Fleet leaders have more data than ever, but turning that data into clear, actionable decisions remains a challenge. This white paper shows how leading organizations are using connected vehicle data to improve safety, reduce costs, and optimize fleet performance. Learn how to turn insight into action across your fleet.
Read More →Are You Tracking Your Fleet's True Total Cost of Ownership?
Bobit Business Media surveyed 190 fleet professionals and found that while most fleets are tracking costs, fragmented systems and data gaps are keeping true TCO visibility out of reach. With rising pressure to control spend in an increasingly volatile environment, the gap between what fleets think they know and what the data actually shows is wider than you might expect. See how your peers are managing costs today and where the industry still has room to improve.
Read More →
Epic Charging Acquires Bluedot Technologies
Epic Charging has acquired Bluedot Technologies, expanding EV fleet charging access to more than 80% of U.S. public charging networks.
Read More →
CALSTART Adds 64 New Sites and Features to Its Medium- and Heavy-Duty Zero-Emission Infrastructure Map
CALSTART’s interactive National Medium- and Heavy-Duty Zero-Emission Infrastructure Map now locates approximately 1,500 ports at 162 total public, semi-public, and shared electric vehicle (EV) charging and hydrogen refueling facilities for Class 2b-8 trucks.
Read More →
Mack Trucks Expands Full-Service EV Infrastructure Providers
Mack Trucks has expanded its comprehensive Turnkey Solutions program for Mack battery-electric vehicle customers with the addition of two new full-service providers, ABM and Lane Valente Industries.
Read More →
EV Realty Opens Major Truck Charging Hub in California’s Inland Empire
EV Realty’s San Bernardino Powered Properties’ truck charging hub, which has now opened, can serve over 200 medium- and heavy-duty trucks per day.
Read More →
WEX Launches Solution to Close the EV At-Home Charging Visibility Gap for Fleets
WEX unveiled its EV At-Home with Vehicle Fraud Protection, which ensures accurate and secure reimbursement for at-home charging.
Read More →
Toyota Motor Corporation to Join Daimler Truck & Volvo Group in Fuel Cell Joint Venture Cellcentric
Toyota intends to join Daimler Truck and Volvo Group as an equal shareholder in Cellcentric. All three shareholders intend to further strengthen Cellcentric as a leading manufacturer of fuel cell systems for heavy-duty commercial applications.
Read More →
