With winter comes storms, and utilities across the country are preparing for snow. Akron, Ohio-based FirstEnergy completed maintenance on its equipment and infrastructure before the beginning of winter.
Infrastructure maintenance included inspecting heating equipment for substation components and winterizing substation buildings that house remote-controlled relay equipment. Company bucket trucks and other vehicles were also inspected to ensure safe operation, with a focus on the condition of tires and air braking systems, which can freeze if moisture is present.










