Learn More: GM on Track to Source 100% Renewable Energy in the U.S. by 2025
GM Announces $7 Billion EV Investment in Michigan
Ramping up battery cell and electric truck manufacturing capacity in the Great Lakes State will increase supply and bring hundreds of new jobs as GM pushes for an all-electric future.

Ultium Cells receives a $2.6 billion investment for a third battery cell manufacturing plant in the United States. It will be located in Lansing, Mich., and expected to open late 2024.
Photo: GM

The Jan. 25 announcement was held in Boji Tower in Lansing, Michigan and featured remarks from GM's Mary Barra, as well as the state governor and other legislative and industry leaders. “We’re conveying an all-electric future, which has zero crashes, zero emissions and zero congestion,” Barra said.
Photo from GM's announcement event
In a live news conference on Jan. 25, GM announced an overall $7 billion investment into various EV and battery-related production and plants across four Michigan manufacturing sites.
This will significantly increase battery cell and electric truck manufacturing capacity and is the single largest investment in GM history, according to the announcement. The investment will cover construction of a new Ultium Cells battery cell plant in Lansing, Michigan, and the conversion of GM’s assembly plant in Orion Township, Michigan, for production of the Chevrolet Silverado EV and the electric GMC Sierra, GM's second assembly plant scheduled to build full-size electric pickups.
"Today we are taking the next step in our continuous work to establish GM’s EV leadership by making investments in our vertically integrated battery production in the U.S., and our North American EV production capacity,” said Mary Barra, GM chair and CEO. “We are building on the positive consumer response and reservations for our recent EV launches and debuts, including GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV, and Chevrolet Silverado EV. Our plan creates the broadest EV portfolio of any automaker and further solidifies our path toward U.S. EV leadership by mid-decade.”
The Orion and Ultium Cells Lansing investments will support an increase in total full-size electric truck production capacity to 600,000 trucks when both Factory ZERO and Orion facilities have ramped up. The company is also investing in its two Lansing-area vehicle assembly plants for near-term product enhancements.
The announcement includes investments in the following locations:
Orion Assembly for production of Chevrolet Silverado EV and electric GMC Sierra — GM is investing $4 billion to convert the facility to produce electric trucks using the GM-developed Ultium Platform, which gives the company the flexibility to build vehicles for every customer and segment. This investment is expected to create more than 2,350 new jobs at Orion and retain approximately 1,000 current jobs when the plant is fully operational. GM estimates the new jobs at Orion will be filled by a combination of GM transferees and new hires. Electric truck production, including the Chevrolet Silverado EV and electric GMC Sierra, will begin at Orion in 2024. The Orion investment will drive significant facility and capacity expansion at the site, including new body and paint shops and new general assembly and battery pack assembly areas. Production of the Chevrolet Bolt EV and EUV will continue during the plant’s conversion. Site work begins immediately.
New Ultium Cells battery cell plant at Lansing site — GM and LG Energy Solution, via their Ultium Cells joint venture, are investing $2.6 billion to build Ultium Cells' third U.S. battery cell manufacturing plant. This investment is expected to create more than 1,700 new Ultium Cells jobs when the plant is fully operational. Site preparations begin this summer and battery cell production is scheduled to begin in late 2024. Ultium Cells Lansing will supply battery cells to Orion Assembly and other GM assembly plants.

GM's investment will support the Orion assembly plant to produce the Chevrolet Silverado EV and electric GMC Sierra.
Source: GM
Orion Assembly will become GM's third U.S. assembly plant being transformed for production of Ultium-powered EVs. GM assembly plants in North America currently building, or being converted to build EVs, include Factory ZERO in Detroit and Hamtramck, Mich.; Spring Hill Assembly in Spring Hill, Tenn.; CAMI in Ingersoll, Ontario, and Ramos Arizpe Assembly in Mexico. By the end of 2025, GM will have more than 1 million units of electric vehicle capacity in North America to respond to growing electric vehicle demand.
The Ultium Cells Lansing site represents GM's third Ultium Cells battery cell manufacturing site in the U.S., following two Ultium Cells battery cell manufacturing plants being constructed in Ohio and Tennessee.
In addition to the EV-related investments in Michigan, GM is investing more than $510 million in its two Lansing-area vehicle assembly plants to upgrade their production capabilities for near-term products:
Lansing Delta Township Assembly — Investment is for production of the next-generation Chevrolet Traverse and Buick Enclave.
Lansing Grand River Assembly — Investment is for plant upgrades.
"These important investments would not have been possible without the strong support from the Governor, the Michigan Legislature, Orion Township, the City of Lansing, Delta Township as well as our collaboration with the UAW and LG Energy Solution,” Barra added. "These investments also create opportunities in Michigan for us to bring our employees along on our transition to an all-electric future.”
GM projects it will convert 50% of its North American assembly capacity to EV production by 2030.
In addition to strategically adding battery cell and electric vehicle assembly capacity, GM is working to build a new supply chain via strategic supplier agreements for batteries and EV components. These agreements include:
MP Materials to scale rare earth magnet sourcing and production in the U.S.
VAC to build a new magnet factory in the U.S. to support EV growth.
POSCO to build a new North America plant to process Cathode Active Material.
GE Renewable Energy to serve as a source of rare earth and other materials.
Wolfspeed to develop and provide silicon carbide power device solutions.
Controlled Thermal Resources to develop a source of U.S.-based lithium through a closed-loop process with lower carbon emissions when compared to traditional processes.
Originally posted on Automotive Fleet
More Vehicle Insights

Kenworth T680 Featuring Special Design Will Transport U.S. Capitol Christmas Tree to Washington, D.C.
A Kenworth T680 departed the Nez Perce-Clearwater National Forest in Idaho this week to deliver the 2026 U.S. Capitol Christmas Tree, a 76-foot Engelmann spruce. This marks the 13th year a Kenworth is delivering the tree.
Read More →
Workhorse Partners with Tristan Fleet Management to Sell and Service Electric W56 Step Vans in Canada
Workhorse’s first Canadian dealer partnership, with Tristan Fleet Management, builds on five years of selling electric step vans in Canada.
Read More →
GM Launches Manufacturing Futures Under its $50M Commitment to Michigan
General Motors’ new initiative, Manufacturing Futures, will connect 2,800 Michigan middle school students each year with advanced manufacturing education and career pathways.
Read More →
Ford Super Duty Fleet Guide Specs Capability and 2027 Updates
Explore 2027 Ford Super Duty fleet specs, gas and diesel engines, towing, payload, configurations, work features, technology, and model-year updates.
Read More →
Re-rating Gross Vehicle Weight Ratings (GVWR): Why and How it's Done
Sometimes, it is not in a fleet’s best interests to have a vehicle at a given GVWR. Changing the GVWR to a special value can be done, but the process is complicated.
Read More →
Which Pickup Trucks Last 250,000 Miles? 2026 Rankings Revealed
Which pickup trucks are most likely to reach 250,000 miles? The 2026 iSeeCars study ranks 12 long-lasting models, with Ram, Toyota, GMC, and Ford among the leaders.
Read More →
Peterbilt Showcasing Transportation Innovations at ATA MCE
Peterbilt showcased Paccar Connect and exhibited several trucks during the American Trucking Associations (ATA) Management Conference & Exhibition (MCE).
Read More →
Volvo Unveils New VNX Vocational Truck & Off-Road Capable Tractor
Volvo Trucks has launched the VNX, a new vocational truck designed for on- and off-road use, and available in three variants. It is powered by the D13 platform, which delivers up to 540 horsepower and 1,950 pound-feet of torque and is EPA 2027 compliant.
Read More →
Truckers’ Strike Rumors, Electric Fleet Lessons, and GM’s New Duramax Lead This Week’s News
Truckers’ strike rumors, Republic Services’ electric fleet lessons, GM’s new 8.3L Duramax, van upfitting, Ford Pro used trucks, and more headline this week’s Truck Chat Cheat Sheet.
Read More →
Morgan Olson Launches North America’s Longest Working Step Van Challenge
Morgan Olson has launched North America’s Longest Working Step Van Challenge, a new customer campaign to find the longest-working qualifying Morgan Olson or Grumman step van actively delivering packages for an independent service provider contracted by FedEx.
Read More →

