Loading data...
Ford Pro and the City of Dallas have entered into a 10-year agreement to expand and manage the City’s fleet operations' EV charging infrastructure.
Read More →Ford engineers took the first all-electric F-Series to two of America’s toughest real-world towing routes during development – Davis Dam in the summer and TFLTruck’s Ike Gauntlet in the winter.
Read More →As part of Ford’s just-released registration site for the electric E-Transit van, Ford has updated targeted battery ranges by body type, roof height, and wheelbase, along with targeted MSRPs for each configuration.
Read More →Alliance AutoGas has announced the pursuit of CARB certification for the 2016 Ford Transit, which it is currently taking orders in 49 states for.
Read More →Ford Pro Charging will provide services to aid in implementing electric vehicle charging through consulting on the design and construction of charging sites, providing software and hardware infrastructure to support energy management, and working with local utilities on energy and infrastructure needs.
Read More →USPS contractor McAbee Trucking purchased eight propane Autogas-fueled Ford F-750 delivery trucks that are contracted for parcel delivery routes between USPS locations in North and South Carolina.
Read More →Altech-Eco Corporation of Asheville, N.C., offer a new CNG system in its product line, the 2014 model-year Ford F-150 3.7L pickup truck with the Ford supplied CNG gaseous prepped engine.
Read More →Ford is re-introducing a gaseous prep package for its 2016 F-150 to enable bi-fuel or dedicated CNG and propane autogas use. The package was last offered with the 2014-MY F-150.
Read More →Ford is offering flex-fuel capability and an integrated air compressor for its 7.3L V-8 gasoline engine. The new 2021 F-600 Super Duty chassis cab is now available to order as well.
Read More →The Air Lift 1000 system fits into the front coil springs of the Ford F-250/F-350, providing suspension support when using a front snow plow or in-bed camper.
Read More →