Gilbarco Veeder-Root officials told HDT and other industry press that designing the infrastructure was not a quick process, and required consideration of specific use cases, length of the routes and site layouts.
Photo: HDT/Vesna Brajkovic
Gilbarco Veeder-Root officials told HDT and other industry press that designing the infrastructure was not a quick process, and required consideration of specific use cases, length of the routes and site layouts.
0 Comments
See all comments